Store address and hours
location_on 4131 Fraser St. Vancouver BC Get Directions
phone 604-875-1993 Call us
access_time Hours
Monday - Friday | 9AM - 5:30PM |
Saturday - Sunday & Holidays | Closed | See Holiday Hours |
-
close
-
CATEGORIES
-
-
-
-
-
-
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
-
-
More mirco-controllers
-
More Developement Tools
-
-
More Prototyping
-
More Modules
-
-
Featured Items
-
More prototyping Tools
-
-
-
-
-
-
-
-
Featured Item
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
-
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
-
Popular Cleaners
-
-
-
Featured Items
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
Featured Items
-
-
-
-
Featured Products
-
-
-
-
-
more motor
-
-
more power supplies
-
-
Featured Items
-
-
-
more electrical devices
-
-
-
-
-
-
-
Featured Items
-
-
-
-
-
-
BRANDS
-
- PROJECTS
-
COMMUNITY
-
-
-
FEATURED POSTS
-
-
-
- SALE
- GST/HST Break
RELAY MODULE 2-RELAY SPDT 24VDC HIGH/LOW TRIGGER
Description
Specification:
Working voltage: 5V, 12V, 24V(Optional)
load: AC 250V/10A; DC 30V/10A
Channel: 2
Product dimension: 50*41*18.5mm / 2*1.6*0.7in
Power light: Green
Relay light: Red
Board color: Red
Package list:
1 * Relay Module
Note:
Module interface:
1. DC+: Connect the positive pole of the power supply
2. DC-: Connect power supply negative pole
3. IN1:1 signal trigger terminal, can set high or low level control relay suction
4. IN2:2 signal trigger terminal, can set high or low level control relay suction
Relay output:
1. NO1: 1 channel relay usually opens the interface. The relay is suspended before suction and short-connected with COM1 after suction.
2. COM1: 1 channel relay common Interface
3. NC1: 1 channel relay normally closed interface, short connection with COM1 before relay suction, suspension after suction
4. NO2: 2 channel relay often opens interface. The relay is suspended before suction, and is short-connected with COM2 after suction.
5. COM2: 2 channel relay common interface
6. NC2: 2 channel relay normally closed interface, short Connection with COM2 before relay suction, suspension after suction.
High and low level trigger selector:
1. S1 is the trigger selection of high and low level 1 channel relay.
2. S2 is the trigger selection of high and low level 2 channel relay.
3.com and low short connection, the corresponding relay is low-level trigger, com and high short connection is high-level trigger.